Insulation Resistance is specified for medium-voltage air circuit breakers in maintenance testing at clause 7.6.1.3.B.2 of ANSI/NETA MTS-2023. The clause calls for a one-minute insulation-resistance test on each pole, phase-to-phase and phase-to-ground with the breaker closed and across each open pole, at the manufacturer's test voltage.

Value: medium-voltage air circuit breakers

ProvenanceANSI/NETA MTS-2023 supports data record tests.insulation-resistance.equipment.breaker-mv-air.maintenance, which is cited on the entry Insulation Resistance.SOURCEANSI/NETA MTS-2023ANSI/NETA MTS-2023Licensed standard, clause 7.6.1.3.B.2DATA RECORDtests.insulation-resistance.equipment.breaker-mv-air.maintenancetests.insulation-resista..Verified 2026-10-29ENTRYInsulation ResistanceInsulation ResistanceNo revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceANSI/NETA MTS-2023Licensed standard, clause 7.6.1.3.B.2
Data recordtests.insulation-resistance.equipment.breaker-mv-air.maintenanceVerified 2026-10-29
EntryInsulation ResistanceNo revisions
Subject
Insulation Resistance (Test methods)
Kind
Equipment fact
Source
ANSI/NETA MTS-2023, clause 7.6.1.3.B.2, Maintenance Testing Specifications for Electrical Power Equipment and Systems, NETA. Publisher page for ANSI/NETA MTS-2023Publisher information page
Also stated in
  • Stated independently by FIST 3-16, section 5.2.4, page 39 (May 2024).
    Read the reference passage

    5.2.4 Insulation Resistance Test

    "Measure the insulation resistance of each pole for 1 minute at an applied voltage that is in accordance with the manufacturer's O&M manual or a minimum of two times the rated voltage plus 1,000 volts, up to 10 kV. The test should be performed on individual poles with the breaker closed and the unused poles and frame grounded. An additional test should be performed with the breaker open and one side of the breaker grounded to measure the open poles."

    FIST 3-16, section 5.2.4, page 39, May 2024. Agency copy of FIST 3-16

    The current standard governs; this passage is a public-domain description of the practice dated May 2024.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-29created

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.insulation-resistance.equipment.breaker-mv-air.maintenance." Circuit Breaker Reference. 2026-10-29. https://www.circuitbreakerreference.com/data/tests.insulation-resistance.equipment.breaker-mv-air.maintenance/.